- Raised
- 1 Dec 2023
- Due
- 31 Mar 2024
- Review
- —
- Expires
- 31 Mar 2024
- Author
- Scott Osborne
- Submitted
- 7 Mar 2024
- Approved
- 7 Mar 2024
- Declined
- —
- Authorised by
- —
- Authorisation ref
- —
- Last actioned
- 7 Mar 2024
Scope of works
Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
Description
National Archives Fire Doors Defects Quotation December 2023