- Raised
- 4 Aug 2023
- Due
- 3 Sept 2023
- Review
- —
- Expires
- 3 Sept 2023
- Author
- Duncan Balmer
- Submitted
- 4 Aug 2023
- Approved
- —
- Declined
- —
- Authorised by
- —
- Authorisation ref
- —
- Last actioned
- 25 Oct 2023
Scope of works
Leading Fire Services are pleased to submit for your consideration our proposal for the upgrade of the non-compliant fire tanks identified during the recent inspection of the fire protection equipment. 1. Supply & Installation of if Galvanised Panel Tank with up to 25 Year Warranty 2. Design based on AWWA D103-1997, Engineering, Supply, Install & Testing of Galvanised Bolted Panel Tanks with 30 Years Design Life & 25 Year Warranty. 3. Non-trafficable colorbond roof with Manhole & Filler Box 4. Reinforced PVC Internal Liner with 15 Year Warranty - Waterproofed to all penetrations 5. Design and Engineering 6. Galvanised Wind Girders 7. Straight up internal ladder engineered to AS4020 8. External ladder & lockable cage engineered to AS4020 9. Galvanised Rooftop Landing Platform with Handrails 10. All Internal & External Fittings - Suction with Anti-Vortex, Overflow, Inlet and Drain 11. HDG Side Access Manway 750mm Diameter 12. Water Level Indicator 13. Delivery to site 14. Insurances, SWMS, ITP’s, Warranties, O&M Manual, Permits and Programs 15. 3 x Confined Space and Working at Heights Trained Technicians 16. Hire of Gas Detector and Emergency Extraction System 17. Form 15 & 16 - Engineering
Description
Upgrade Fire Tanks