Defect Quotes
616 quotes
All
Draft
Submitted
Actioned
Declined
Expired
Voided
Status
Ref
Property
Client
Severity
Raised
Due
Expires
Actioned
Q-0032
As requested by Alan Niland, the Master Reset button on the E Control Evacuation System has failed due to usage. This front panel display unit and metalwork requires replacement to rectify.
Southern Queensland Correctional Centre
Southern Queensland Correctional Centre
—
1 Sept 2023
1 Oct 2023
1 Oct 2023
Actioned
Q-0034
Our quotation is for the repair of the existing Fire Hose Reels on site at Progress Rail. Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
Progress Rail Redbank
Progress Rail
—
1 Sept 2023
30 Nov 2023
30 Nov 2023
Actioned
Q-0026
Replace the existing fire tank level indicators
Cabanda Care
Cabanda Care
—
7 Aug 2023
6 Sept 2023
6 Sept 2023
Actioned
Q-0027
Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. - Supply and install a new Notifier CFP-16 conventional fire indicator panel complete with 60W O.W.S and 72hr battery back up to replace the obsolete and faulty Ampac AB800. - Supply and install 25 x conventional smoke detectors to replace the existing. - Supply and install 10 x conventional thermal detectors to replace the existing. - testing and commissioning. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
PCYC Gladstone
QLD Police Citizens Youth Welfare Association
—
7 Aug 2023
6 Sept 2023
6 Sept 2023
Actioned
Q-0024
Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Carry out the required repairs to the existing fire tanks.
Cabanda Care
Cabanda Care
—
4 Aug 2023
27 Nov 2023
27 Nov 2023
Actioned
Q-0022
Attend site replace the Water damaged heat detector head and base located in the workshop
Brisbane Manor Hotel
Brisbane Manor Hotel
—
2 Aug 2023
1 Sept 2023
1 Sept 2023
Actioned
Q-0017
During the recent inspection the following defects were identified for rectification.
National Archives Australia
National Archives Australia
—
31 July 2023
30 Aug 2023
30 Aug 2023
Actioned
Q-0019(v4)
Round House No allowance has been made for the installation of new wiring should the existing be found to be faulty. We have not allowed for a high risk spotter for working at heights.
Rockhampton Rail
Rockhampton Rail
—
31 July 2023
30 Aug 2023
31 Oct 2023
Actioned
Q-0019(v3)
Building H No allowance has been made for the installation of new wiring should the existing be found to be faulty. We have not allowed for a high risk spotter for working at heights.
Rockhampton Rail
Rockhampton Rail
—
31 July 2023
30 Aug 2023
31 Oct 2023
Actioned
Q-0019
Building C No allowance has been made for the installation of new wiring should the existing be found to be faulty. We have not allowed for a high risk spotter for working at heights.
Rockhampton Rail
Rockhampton Rail
—
31 July 2023
30 Aug 2023
31 Oct 2023
Actioned
Q-0016
During the recent annual inspection, the following defects were identified for rectification.
Southern Queensland Correctional Centre
Southern Queensland Correctional Centre
—
31 July 2023
30 Aug 2023
30 Aug 2023
Actioned
Q-0014
During the recent annual inspection, it was identified that the following VESDA units do not meet the installation requirements of the Project Services ASD installation specification. Our price is for the following. - Modify the existing 9 x VLF-250 toilet exhaust units in the residential blocks. - Modify the existing 1 x VLF-250 toilet exhaust unit in the Detention block. - Modify the existing 1 x VLF-250 toilet exhaust unit in the Medical block. - Replacement of blocked and damaged pipework as required. - Replacement of VLF-250 filters with new. - Programming and commissioning. Exclusions. - We have not allowed for the installation of the require access hatches in the duct work. - We have not allowed for supplying new VESDA VLF-250 should the existing units fail.
Southern Queensland Correctional Centre
Southern Queensland Correctional Centre
—
30 July 2023
31 Aug 2024
31 Aug 2024
Actioned
Q-0012
During the recent fire door inspection the following defects were identified for rectification.
Marlborough CTS 12012
Marlborough CTS 12012
—
27 July 2023
26 Aug 2023
1 Sept 2023
Actioned
Q-0011
During the recent annual inspections, the following defects were identified for rectification.
Southern Queensland Correctional Centre
Southern Queensland Correctional Centre
—
24 July 2023
23 Aug 2023
23 Aug 2023
Actioned
Q-0008
During the recent monthly inspection, the following defects were identified for rectification.
idec Solutions Pty Ltd
idec Solutions Pty Ltd
—
25 June 2023
25 July 2023
25 July 2023
Actioned
Q-0003
During the recent audit of the fire extinguishers located at Petra Westkey, 74 - 76 Magnesium Drive, Crestmead, the following defects were identified for rectification.
74 - 76 Magnesium Drive
Princess Mary Trust
—
14 June 2023
14 July 2023
31 July 2023
601–616 of 616
Previous
Page 13 of 13
Next